All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

Projects

Home > Projects
The Work Speaks for Itself.

The scope changes. The standard does not.

ASI completes 2,500+ projects annually, from critical single-site work to National and Multi-Site programs. The work below shows how one accountable partner connects construction, electrical, low voltage, furniture, relocation, decommissioning, logistics, documentation, and closeout to protect the schedule, control risk, and carry responsibility through completion.

Low-profile under-carpet power and data pathway routed to modular workstations
Under-Carpet Power & Data Coordination

U.S. Bank Dubuque

Dubuque, IA

Brown and Caldwell San Diego cleared office interior
Paired Office Moves, Technology Integration & Closeout

Brown & Caldwell San Diego + Phoenix

San Diego, CA + Phoenix, AZ

Delta LAX opened shower wall exposing concealed pipework
Concealed Leak Investigation, Controlled Demolition & Plumbing Repair

Delta LAX

Los Angeles, CA

Apple Perimeter back-of-house wall finishes
Accelerated Back-of-House Refresh

Apple Perimeter

Atlanta, GA

HCLTech Cary cooling equipment | Before
Technical Infrastructure Decommissioning

HCLTech Cary

Cary, NC

Dassault Systèmes Paso Robles meeting-room technology environment
Relocation, Electrical, Low Voltage & Workplace Technology

Dassault Systèmes Paso Robles

Paso Robles, CA

U.S. Bank Camino Del Rio workstations and technology reset | Completed
Two-Site Consolidation, Construction and Technology Reset

U.S. Bank San Diego

San Diego, CA

Stantec Santa Barbara workplace installation in progress
Office Reconstruction, Systems Integration & Workplace Delivery

Stantec Santa Barbara

Santa Barbara, CA

NGFCU Palmdale kiosk power and data pathway installation
Branch Renovation & Kiosk Integration

NGFCU Palmdale Branch

Palmdale, CA

Completed Stantec Broomfield workplace with glazing and built-in work surfaces
Tenant Improvement & Complete Workplace Delivery

Stantec Broomfield

Broomfield, CO

Dassault Systèmes Michigan multi-site transition
Multi-Site Workplace, Technology & Decommissioning Transition

Dassault Systèmes Michigan

Auburn Hills, Dearborn & Royal Oak, MI

Alera Group and Barkley Oxnard technology integration
Network, Access, AV & Workplace Integration

Alera Group / Barkley

Oxnard, CA

Thomson Reuters Los Angeles project setting with equipment enclosure and building systems
Construction, Workplace Transitions, Technical Closeout & Facilities

Thomson Reuters

United States & Canada

Panasonic project trucks and removal bins
Accelerated Facility Decommissioning & Restoration

Panasonic

California

First American Title Las Vegas workplace with workstation rows and enclosed offices
National Workplace Planning, Integrated Trades & Transitions

First American Title

More than 50 service locations in 14 states

NGFCU Gardena branch construction work
Full Branch Transformation & Workplace Reset

NGFCU Gardena Branch

Gardena, CA

Workstation installation during a confidential office relocation
Cross-Country Relocation, Reuse & Decommissioning

Enterprise Office Relocation

California to Chicago, IL

Deloitte Glendale open office before coordinated decommissioning
Office Decommissioning, Warehouse Dismantling & Material Recovery

Deloitte Glendale

Glendale, CA

Completed Stantec Madison workplace
Office Buildout & Specialized Technical Spaces

Stantec Madison

Madison, WI

Custom furniture in the K-Swiss Glendale product showroom
Site Restoration, Technology & Workplace Activation

K-Swiss

Los Angeles & Glendale, CA

Vans Costa Mesa headquarters workstation rows
Headquarters Reconfiguration, Furniture & Electrical

Vans Costa Mesa

Costa Mesa, CA

BAL San Francisco workplace transformation
Interior Renewal, Electrical & Workplace Transformation

BAL San Francisco

San Francisco, CA

Completed Siemens Albany corridor with renewed walls, carpet and accent finish
Workplace Renewal, Finishes, Power & Data

Siemens Albany

Albany area, New York

Brown and Caldwell Vancouver meeting space with furniture and audiovisual technology
Cross-Border Procurement, Technology & Workplace Transition

Brown & Caldwell Vancouver

Burnaby & Vancouver, BC, Canada

KPMG Seal Beach office decommission
Office Decommissioning, Asset Reuse & Electrical Safe-Off

KPMG Seal Beach

Seal Beach, CA

Tenant electrical removal during the Dassault Systèmes Woodland Hills decommissioning
Large-Scale Decommissioning, Restoration & Lease Handback

Dassault Systèmes

Woodland Hills, CA

Dassault Systèmes Pleasanton workplace renovation and technology preparation | In Progress
Renovation, Technology Integration & Workplace Transition

Dassault Systèmes Pleasanton

Pleasanton, CA

Toronto workplace decommissioning
Furniture, Technical Systems & Two-Floor Workplace Transition

Thomson Reuters Toronto

Toronto, ON

Arrow Electronics consolidated workstations
National Portfolio Consolidation & Facility Closeout

Arrow Electronics

Nationwide

Vans Cypress headquarters decommission
Headquarters Decommissioning, Electrical Safe-Off & Loadout

Vans Cypress

Cypress, CA

Built production-set structure at the AwesomenessTV and Viacom Canoga Park studio
Accelerated Studio Decommissioning, Restoration & Lease Handback

AwesomenessTV & Viacom

Canoga Park, CA

Stantec Hauppauge workstation reconfiguration | Completed
Planning, Construction, Furniture & Portfolio Support

Stantec National Program

United States & Canada

Completed Stantec Austin plot room
Workplace Renovation & Building Systems Integration

Stantec Austin

Austin, TX

CIM Group workplace reconfiguration
Occupied-Office Transformation & Integrated Trades

CIM Group

Los Angeles, CA

Brown and Caldwell network infrastructure
Multi-Site Technology Rollout & Program Management

Brown & Caldwell

25 U.S. states, Guam & British Columbia

Wide view of Presbia workstations and offices
Workplace Strategy, Redesign & Relocation

Presbia

California

Ready to Move Your Project From Plan to Field?