All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

Enterprise Office Relocation

Home > Projects > Enterprise Office Relocation

Case Study | Workplace Relocation + Reuse

80% Lower Cost.
1,800-Mile Move.
One Accountable Plan.

A confidential logistics company connected decommissioning, reuse, transportation, and reinstallation in one plan.

View Full Case Study PDF


Cover of the Enterprise Office Relocation case study

$120KReported cost avoided
75%Furniture reused or donated
2 DaysAhead of schedule

Overview

Challenge

Relocate operations from California to Chicago while decommissioning a 55,000-square-foot facility and avoiding the cost of an all-new workstation package.

ASI Approach

Reuse existing workstations, connect decommissioning and low-voltage removal with interstate logistics, then clean and reinstall the furniture in Chicago.

Results

  • $120,000 in reported avoided cost
  • 12,000 lb of metal recycled
  • Completed two days early and on budget

Project Info

Client
Confidential
Industry
Global Logistics and Supply Chain
Project Type
Cross-country relocation and decommission
Route
California to Chicago, Illinois
Origin Site
55,000 square feet
Core Scope
Furniture, technology, security, and restoration

The ASI Approach

From Asset Plan to Rebuild.
One Connected Move.

ASI turned existing workplace assets into a coordinated relocation strategy, joining field execution, logistics, and closeout under one accountable team.

01AssessCompare the new-furniture option with the condition, reuse value, and logistics of the existing workstations.
02DecommissionClear the California workplace and coordinate server-room, Cat 6, card-access, and security-system removal.
03PrepareDisassemble, clean, protect, label, and stage the retained assets for the interstate move.
04TransportCoordinate loading, shipment, unloading, and handoff across more than 1,800 miles.
05RebuildReinstall the workstation package in Chicago, verify the finished condition, and close the project.

The Outcome

$120,000 in Reported Avoided Cost.
Two Days Ahead.

A practical reuse plan delivered a cleaner financial, operational, and material-recovery outcome.

Capital Preserved

Reuse reduced the furniture requirement from a $150,000 purchase option to a $30,000 delivery plan.

Assets Kept Working

Seventy-five percent of furniture was reused or donated instead of being sent to landfill.

One Coordinated Route

Decommissioning, transport, cleaning, installation, and closeout stayed connected across the full move.

Schedule Certainty

The Chicago handoff was completed two days early without exceeding the approved budget.

Relocation Execution

The California workplace was evaluated, prepared for transit, and rebuilt in Chicago through one connected asset plan.

Client Feedback

“ASI finished two days early and right on the budget. IMPRESSIVE.”

Confidential Client
Global Logistics and Supply Chain

Client Feedback

“Installation has been great with a great lead. It has been a pleasure working with these installers.”

Confidential Client
Global Logistics and Supply Chain

One Accountable Partner. Nationwide.

From Plan to Closeout.

ASI coordinates workplace reuse, relocation, technology removal, restoration, and installation through one practical delivery plan.

Project note: The 80 percent comparison reflects a $150,000 new-furniture proposal versus a $30,000 reuse plan. The project also kept 75 percent of furniture in reuse or donation streams and recycled 12,000 lb of metal.

Ready to Move Your Project From Plan to Field?