All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

Stantec Austin

Home > Projects > Stantec Austin

Project Profile | Tenant Improvement

2,049 SF Tenant Improvement.
Within a 16,752 SF Workplace.

A permitted 2,049 square foot remodel connecting secure access, plot and IT support, storage, life safety, building systems, acoustics, equipment, and finishes within Stantec’s larger Level 3 workplace.

View Full Case Study PDF


Cover of the Stantec Austin workplace tenant improvement case study

16,752SF total project footprint
2,049SF permitted TI area
21Coordinated drawings

Overview

Challenge

Rebuild interdependent work areas within Stantec’s Level 3 workplace while protecting power, fire alarm, life safety, security systems, retained finishes, and active circulation. Material movement also had to be planned without a freight elevator.

ASI Approach

Serve as the accountable GC, convert and reconfigure the spaces, then coordinate partitions, rated doors, glazing, access, electrical, lighting, HVAC, sprinklers, acoustics, ceilings, flooring, furniture, and equipment through one field plan.

Results

  • Secure entry and circulation rebuilt
  • Plot, IT, and storage functions reconfigured
  • Building systems and finishes integrated

Project Info

Client
Stantec
Project Type
Workplace tenant improvement
Location
Austin, Texas
Project Footprint
16,752 SF workplace
Contract
AIA A104 general contracting
Permitted TI Area
2,049 SF

The ASI Approach

Rebuild the Workplace.
Keep the Building Operating.

The footprint was focused, but the work touched circulation, security, life safety, technical production, storage, furniture, equipment, and live building systems across the third level.

01Protect OperationsMaintain power, fire alarm, life safety, and security continuity outside the remodel area while coordinating work around an operational building.
02Rebuild Key SpacesConvert the conference room to storage, enclose the elevator lobby, and reconfigure the plot room and IT workroom around their operating needs.
03Integrate SystemsCoordinate partitions, rated doors, glazing, access hardware, power, lighting, HVAC balancing, sprinklers, acoustics, ceilings, and finishes.
04Relocate the WorkplaceMove workstations, plan storage, shelving, plotters, copiers, doors, and support equipment into the rebuilt configuration.
05Control Field ChangeManage eight documented change-order files, permitting, inspections, cleaning, punch work, and project records through one accountable path.

The Outcome

More Functional Space.
One Accountable GC.

ASI connected the physical rebuild, the systems behind it, and the workplace assets inside it through one construction delivery path.

Secure Arrival

A new enclosed elevator lobby combined rated construction, glazing, access hardware, and exit-sign coordination.

Production That Works

The plot and IT work areas gained reconfigured partitions, doors, shelving, equipment locations, lighting, power, pathways, and air balancing.

Purpose-Built Support

A former conference area became organized storage with new partitions, door, shelving, finishes, lighting, return air, and sprinkler work.

One Integrated Workplace

Relocated workstations, plotters, copiers, plan storage, library shelving, equipment shelving, and support items were coordinated into the new layout.

Multi-Trade Construction

The permit set connected architecture, access, power, lighting, HVAC, fire protection, acoustics, ceilings, finishes, and workplace equipment inside one operating office.

One Accountable Partner. Nationwide.

From Plan to Closeout.

Framing, concealed systems, retained finishes, room conversions, and completed workplace functions were carried through one coordinated construction plan.

Ready to Move Your Project From Plan to Field?