All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

Our company history

Built to Take Ownership.
Built to Keep Moving.

ASI began in San Diego in 2011 with a practical idea: clients should not have to manage disconnected vendors, trades, and field teams to move a workplace project forward. As assignments grew, ASI connected construction, electrical, low voltage, furniture, relocation, technology, and closeout around one plan, one schedule, and one accountable team.

Today, ASI brings that model to focused site work and complex national and international programs. Follow the road to see how each capability expanded, and how the same standard still guides every project: take ownership, solve the details, and carry the work through completion.

2011

It starts in
San Diego.

Jordan P. Shapiro founded All Solutions, Inc. in San Diego in 2011. His background in construction and workplace services shaped the company’s practical approach to project execution.

The purpose was practical: connect the client’s plan with the vendors, trades, site access, and schedules needed to make the work happen.

The starting point: field experience, applied to the whole project.
San Diego, 2011

San Diego roots

2012 to 2014

The delivery process
takes shape.

The early years centered on client relationships, repeat assignments, and a reliable way to organize the work. Delivery windows, site readiness, installer availability, and building access had to fit the same plan.

ASI developed its delivery process around those handoffs: define the scope, make responsibilities clear, connect schedules, and keep the client and field teams informed. Practical logistics and consistent communication became part of the service, alongside the work performed on site.

What changed: individual assignments became a coordinated delivery process.
Receive. Schedule. Deliver. Install.
2015 to 2017

More of the
workplace comes together.

Client needs expanded across furniture coordination, relocations, decommissioning, logistics, and facility services. ASI’s role grew with them, connecting what happened before a move, during an installation, and after a space was vacated.

Relocation and decommissioning also brought technology into the sequence: equipment removal and reset, coordination with client IT teams, and the power and data connections a workplace needs to operate. The move plan and the construction plan had to meet at the same handoff.

Today, ASI connects furniture planning and procurement with receiving, installation, relocation, and site closeout, coordinating with the client’s furniture provider where needed.

A broader role: prepare the workplace, manage the transition, finish the exit.

Explore ASI’s capabilities

Plan the space. Connect the systems. Make the move.

From home base to a wider field

2018 to 2020

The road opens up.
Across markets.

As clients needed support in more locations, ASI expanded its field partner network and project delivery capabilities. The challenge was no longer only getting one site right. It was organizing work across different buildings, local crews, access requirements, and schedules.

National and international delivery added a different coordination challenge. A common scope and reporting standard had to work with each location’s building rules, field resources, and local requirements. ASI’s role connected that wider program to the actual work at each site.

That approach is visible today in the Thomson Reuters work delivered through JLL: workplace transitions, technical decommissioning, building-system repairs, furniture logistics, and landlord handback across U.S. and Canadian markets.

The shift: broader reach, with site-level attention.

Thomson Reuters, through JLL

Across the United States

National delivery.

One coordinated plan. Local field execution.

Beyond borders

International execution.

Connecting procurement, logistics, trades, and workplace transitions.

Today’s reach 50 U.S. states 20 countries
2021

Construction and technology.
One delivery plan.

Contractor licensing became another part of ASI’s integrated capability. Construction, electrical, and low-voltage requirements could be considered alongside furniture, technology, moves, and the activities that depend on a site being ready.

Today, that means connecting interior construction, power, cabling, AV and access-control coordination, and furniture interfaces within the project plan. Each assignment follows the licensing, permit, and qualified-trade requirements of its location.

From the ground up

A workplace taking shape A twelve-story workplace rises from bare ground. Crews grade, place foundations, lift steel and install glass. Two trucks deliver desks and chairs; movers bring furniture inside. After delivery, cars arrive and people walk into their completed workplace.

Every phase. One connected plan.

Site preparation

2022 to 2023

National programs,
built site by site.

With a growing field network and a stronger project management structure, ASI expanded its ability to organize national programs. Relocations, facility upgrades, furniture work, electrical and technology scopes, and decommissioning could be managed across multiple locations.

The Stantec program brings that range into focus: furniture design and procurement, tenant improvements, technology, relocation, and ongoing workplace support. Plans, field work, and the transitions between them are managed as parts of a larger relationship.

The program standard: consistent reporting, clear ownership, local execution.

Explore national and multi-site projects

Thomson Reuters: U.S. and Canadian locations

Lake Oswego, OR Charlotte, NC Toronto, ON

View the Thomson Reuters program

Plans discussed. Work coordinated. Sites delivered.
2024

A commitment to safety.
Recognized.

Avetta presented All Solutions, Inc. with its 2024 Safety Star recognition.

Avetta Safety Star 2024 certificate presented to All Solutions Inc.
Today

A wider reach.
A connected team.

Today, ASI brings project management and field execution together for corporate real estate, facilities, and workplace teams. The work spans construction, technology, furniture, relocation, decommissioning, IT asset disposition, and logistics, from a focused site assignment to a national or international program.

ASI can coordinate the providers a client already uses or organize the required trades and field resources. Our team stays connected through site preparation, execution, testing, punch work, turnover, and agreed closeout. The scope has grown; the work still depends on people who follow through.

The company has grown. Accountability stays personal.
Nine ASI team members and project partners gathered around a connected workplace

Where we go from here

Your next project.

Tell us what’s ahead. We’ll bring the people, planning, and follow-through to help you get there.

Start a conversation

Ready to Move Your Project From Plan to Field?