All Solutions, Inc. (ASI) helps companies execute workplace projects without having to manage disconnected vendors, trades, and field teams on their own.

Follow Us

NGFCU Palmdale Branch

Home > Projects > NGFCU Palmdale Branch

Case Study | Branch Construction

Power for New Kiosks. No Coring. 50% Lower Cost.

NGFCU needed power and data for new self-service kiosks in the center of its Palmdale branch. ASI installed a concealed pathway beneath the carpet and coordinated the lobby refresh, furniture movement, and technology reset around it.

View Full Case Study PDF

Kiosk Power and Data Pathway

Kiosk Power and Data Pathway

Connectrac Flex FX carried power and data across the lobby without opening the slab.

7,897 SFFull branch footprint
50%Lower projected delivery cost versus coring
TwoWeekend execution phases

Overview

Challenge

Provide dependable power and data away from existing walls without the shutdown, dust, and recovery required for traditional concrete coring. Flooring, finishes, furniture, and technology had to be coordinated around the new kiosk infrastructure.

ASI Approach

Route Connectrac Flex FX beneath the carpet, then sequence electrical, low voltage, carpet replacement, lobby painting, furniture movement, and technology reset through one branch delivery plan.

Results

  • Kiosk power and data delivered without slab coring
  • Approximately 2,610 square feet of carpet tile replaced
  • Walls and doors repainted across the 2,399 square foot lobby and teller environment
  • Projected delivery cost reduced by 50 percent compared with coring

Project Info

ClientNorthrop Grumman Federal Credit Union
LocationPalmdale, California
Branch Footprint7,897 square feet
DeliveryTwo weekends, phased execution
Core ScopeKiosk power and data, flooring, paint, furniture, moving, and technology reset
StatusCompleted

The ASI Approach

New Kiosks. One Coordinated Branch Refresh.

The pathway decision established the sequence for electrical, low voltage, flooring, finishes, furniture, and technology. ASI kept each handoff connected to the branch requirements.

01PlanValidate kiosk locations, customer circulation, access, protection, the concealed pathway, and the order of work for every affected trade.
02PowerCarry power and data to the new kiosk positions through a 42.5 linear foot Connectrac Flex FX route beneath the carpet, avoiding concrete coring.
03FinishReplace approximately 2,610 square feet of carpet tile and cove base, then repaint walls and doors throughout the 2,399 square foot lobby and teller area.
04MoveCoordinate kiosk placement, furniture movement, floor access, construction handoffs, and the final branch layout.
05ResetDisconnect, relocate, reconnect, and test computers and phones. Verify kiosk power and data endpoints, then complete cleaning and turnover.

Two Weekends of Coordinated Work

The first phase delivered the kiosk pathway, electrical, low voltage, flooring, and furniture interfaces. The second completed painting, moving, technology reset, detailing, cleaning, and final turnover.

Power and Data Coordination

Connectrac Flex Raceway

ASI coordinated the Connectrac Flex pathway with kiosk power and data, carpet flooring, furniture, and the branch technology reset. The manufacturer’s cut sheet provides the system details behind that coordination.

Connectrac Flex Raceway manufacturer cut sheet

Flex System Cut Sheet

Review the floor-based power and data system, connection options, and component information.

View Full Cut Sheet PDF

Manufacturer resources

The Outcome

Kiosks Powered. Lobby Renewed.

ASI delivered the infrastructure for new self-service kiosks and renewed the public branch interior through one accountable team.

Coring Avoided

The concealed pathway avoided opening the slab and the full weekend shutdown associated with the proposed coring approach.

Infrastructure Connected

Electrical connections, low-voltage cabling, and point-of-use devices were installed and tested for the new kiosk positions.

Finishes Renewed

Carpet replacement and lobby painting were coordinated with floor access, furniture, and the final branch layout.

Technology Returned to Service

Computer and phone disconnection, movement, reconnection, and testing were included in the turnover plan.

Branch Transformation

From Existing Conditions to a Renewed Lobby.

Original Lobby

Original Lobby

Existing flooring and customer circulation established the starting conditions for the branch refresh.

Finished Branch

Finished Branch

New carpet tile conceals the power and data pathway and completes the renewed lobby.

Floor Plans and Scope

The Branch Plan Set the Scope. The Pathway Plan Resolved the Details.

The full branch plan established the 7,897 square foot setting and the public lobby and teller footprint. The dimensioned pathway plan coordinated the route and kiosk endpoints.

Overall Branch Floor Plan

Overall Branch Floor Plan

The branch layout connected customer areas, flooring, finishes, furniture, and access.

Connectrac Power and Data Plan

Connectrac Power and Data Plan

The 42.5 linear foot Flex FX layout coordinated two combined power and data monument locations.

One Accountable Partner.

From Field Planning Through Clean Closeout.

ASI connected the kiosk infrastructure, flooring, paint, furniture movement, technology reset, protection, cleaning, and turnover through one project plan.

Planning a Branch Project?

Bring construction, workplace, technology, and turnover requirements into one coordinated field plan.

Start a Project

Ready to Move Your Project From Plan to Field?