Two Floors. Furniture. Power. One Field Plan.

ASI coordinated workstation teardown, movement and rebuilding between two headquarters floors, linking furniture reuse, electrical work and field changes to the evolving workplace plan.

View Full Case Study PDF
Two FloorsHeadquarters workplace
FurnitureDismantle, move + rebuild
SystemsPower + data interfaces

Overview

Challenge

A headquarters reconfiguration required furniture layouts, reusable components and existing electrical connections to work together across two floors. Additional workstation groups and mobilizations changed the execution sequence.

ASI Approach

Use the floor and spine-location plans to organize teardown and rebuilding, coordinate licensed electrical work, and scale crews and supervision as requirements evolved. One field plan kept furniture, movement, power and data connected.

Results

  • Workstation systems dismantled, moved and rebuilt across two floors
  • Furniture power and data interfaces coordinated with installation readiness
  • Added workstation groups and mobilizations absorbed into one execution plan

Vans | Costa Mesa

This was a sequencing problem as much as a furniture project. The receiving plans defined where systems needed to land, while reusable components, transportation, crews, electrical connections and field changes had to advance in the right order.

Project Info

Client
Vans
Location
Costa Mesa, California
Site
1588 South Coast Drive
Workplace
First and second floors
Delivery
Reconfiguration + electrical
Status
Completed

Plans and Project Scale

The Receiving Plans Set the Layout. The Sequence Made It Work.

The first-floor and second-floor receiving plans connected each workstation group to its destination. Furniture spines and power locations then directed disconnection, movement and rebuilding through the headquarters.

Vans Costa Mesa first-floor receiving layout and phased installation plan
First-Floor Receiving Plan
Vans Costa Mesa second-floor receiving layout and phased installation plan
Second-Floor Receiving Plan
Two FloorsCoordinated workplace change
ReuseDismantle, relocate + rebuild
SystemsFurniture power + data

The Plans Became the Field Sequence

Receiving locations, furniture spines and power points established the order of teardown, movement, rebuilding and reconnection.

The ASI Delivery Model

The Scope Was Connected. So Was the Execution.

ASI connected the receiving plans, reusable furniture, transportation, field crews, electrical disconnection and return work. The sequence adjusted as additional workstation groups entered the assignment.

01

Make the Layout Executable

Use floor and spine-location plans to map workstation groups, reusable components and receiving positions. Connect each teardown area to the layout that must be rebuilt.

02

Dismantle and Preserve Systems

Dismantle specified workstations for relocation and reuse. Keep the components needed for the destination layout organized through handling and movement.

03

Move and Rebuild the Workplace

Coordinate crews and transportation to move furniture between floors and rebuild systems to the receiving plan. Align installation readiness with the next field operation.

04

Coordinate Furniture Power

Coordinate electrical disconnection, make existing junction-box connections safe and reconnect included feeds. Test power within rebuilt cubicle systems as scoped.

05

Absorb Added Scope

Adjust installation crews, transportation, supervision and electrical resources as additional workstation groups and mobilizations change the sequence.

One Team Controlled Every Dependency

Furniture dismantling, component reuse, movement, rebuilding, power and data required different resources. ASI organized those interfaces around the receiving plans and changing field requirements.

Plan Tag Dismantle Move Rebuild Reconnect

One accountable partner from planning through final closeout.

The Outcome

A Reconfigured Headquarters. Changing Scope, One Field Plan.

ASI delivered coordinated teardown, relocation and rebuilding across two headquarters floors. Furniture reuse, power, data and added field requirements stayed connected to the receiving plans through one accountable execution team.

Two FloorsWorkplace Context

Receiving plans established where systems needed to land and how the work moved through the headquarters.

ReuseFurniture Carried Forward

Workstation components were dismantled, relocated and rebuilt for the next configuration.

SystemsInterfaces Coordinated

Furniture power and data interfaces followed installation readiness.

What the Project Delivered

Plans Translated Into Field Sequence

Floor and spine-location drawings linked dismantling to the receiving layout.

Reusable Systems Carried Forward

Workstation components were moved and rebuilt for their next workplace configuration.

Power Aligned With the Workplace

Electrical disconnection and included return connections followed furniture readiness.

Changing Requirements Coordinated

Added workstation groups and mobilizations were incorporated into the same execution plan.

One Accountable Partner. From Furniture Planning Through Final Reconnection.

Delivery Result

The headquarters reconfiguration moved from receiving plans through coordinated teardown, movement, rebuilding and reconnection, with added requirements controlled inside one field sequence.