Case Study | Cross-Border Workplace Transition

Across the Border. Through the Move. Into the Workday.

ASI connected furniture procurement and imports with a Burnaby-to-Vancouver office move, workplace installation, technology reset, and former-office closeout.

View Full Case Study PDF

Meeting Space Ready for Collaboration

Meeting Space Ready for Collaboration

Furniture and meeting technology came together at Brown & Caldwell’s Vancouver destination.

2 sitesBurnaby origin and Vancouver destination
US / CanadaFurniture procurement and cross-border logistics
Full transitionReceiving through workplace turnover and origin closeout

Overview

Challenge

A local office move depended on an international supply chain. New furniture crossed the US-Canada border while reusable assets, employee equipment, and meeting technology moved from Burnaby. Customs, receiving, phased installation, and technology readiness had to align before the former office could be closed out.

ASI Approach

ASI connected furniture procurement, freight and broker coordination, receiving and storage, new and reused furniture installation, relocation, power interfaces, network and AV work, access control, and employee technology reset. The same program carried origin restoration and destination punch through closeout.

Results

  • Cross-border procurement and a two-site relocation coordinated together
  • New furniture, reused assets, and technology integrated at the destination
  • Former-office handback and final installation punch carried through completion

Project Info

ClientBrown & Caldwell

DestinationVancouver, BC, Canada

OriginBurnaby, BC, Canada

ProgramCross-border procurement and workplace transition

Core ScopesFurniture, logistics, relocation, technology, access control, and former-office closeout

StatusCompleted

Plans & Workplace Coordination

New Furniture. Reused Assets. A Connected Destination.

The installation plan identifies what needed to be purchased and what could be redeployed from the origin. That layout set the requirements for receiving, phased delivery, furniture installation, workplace power, and employee technology.

The ASI Approach

The Move Crossed Two Sites. The Supply Chain Crossed a Border.

ASI coordinated the international procurement path with the local field sequence so furniture, technology, and client equipment could come together at the destination.

01Source

Coordinate furniture orders, freight, customs-broker and import requirements, receiving, inspection, storage, and phased release to the site.

02Install

Install the workplace plan, reconfigure reusable assets, coordinate power interfaces, and carry deliveries through supplemental installation and punch correction.

03Connect

Coordinate network infrastructure, AV, access control, equipment reuse, workstation disconnect and reconnect, and technology turn-up.

04Move

Coordinate protection, packing, equipment handling, building access, move sequencing, and placement at the new Vancouver office.

05Close Out

Complete origin cable abatement, designated equipment and branding removal, wall restoration, and handback, along with destination punch and documentation.

From Receiving to Workplace Use

Furniture, Field Work, and Former-Site Closeout.

The transition included receiving and inspection before installation, integrating new furniture with reused assets, and clearing the origin for handback.

The Outcome

A Workplace Ready to Use. A Transition Carried to Closeout.

ASI managed the interfaces that extended beyond move day: imported furniture, local receiving, phased installation, asset reuse, technology, former-office restoration, and final punch.

New and Reused Assets

Procurement and reuse stayed connected to the destination layout and phased installation.

Technology at Destination

AV, voice and data, access control, and employee equipment were coordinated through technical turnover.

Origin Handback

Cable abatement, designated removals, branding, and wall restoration supported the former-office closeout.

Follow-Through Beyond the Move

Supplemental installation, replacements, and final furniture punch remained under the same delivery team.

Explore the Full Vancouver Case Study.

See how ASI connected cross-border furniture supply with local workplace delivery and former-office closeout.

View Full Case Study PDF